Featured Projects:  Conoco-Phillips

Conoco-Phillips Facility-Wide Eight-week Turnaround

Conoco-Phillips

Houston Controls provided Technicians and Journeymen to support this approximately $75 million turnaround, in Spring of 2009. The Conoco-Phillips plant units are interdependent, so several small units were down during the outage of the main processing unit. Project duration was approximately eight weeks. In-house forces provided planning and scheduling.

Our personnel provided construction manpower, loop and interlock checking, commissioning and witnessing of new instrumentation installations, and remained on site as a resource during unit re-start. During the outage, our personnel were employed in most of the units that were down. During startup they were dispatched as-needed and where-needed to assure successful startup and operation.

This project demonstrated that our very experienced personnel are as at-home in a live plant as they are in a green-field construction site, and will work flexibly to meet the Client’s need.


Formosa Plastics
Formosa Plastics
Instrumentation Upgrades and Construction
Valero Refinery
Valero Refinery
Analyzer Optimization Project
BP Turnaround
BP Refinery, Toledo Ohio
Large, Routine Turnaround
Industrial Image
BP Refinery Maintenance
Ongoing Maintenance commitment, integrated with Plant forces
Conoco-Phillips
Conoco-Phillips Refinery
Sweeny, Texas
Support for facility-wide eight-week Turnaround
Industrial Image
Ongoing Design Projects
LyondellBasell Houston Refinery
Industrial Image
Ongoing In-house TA Planning
LyondellBasell Houston Refinery
Greenfield Terminal
LDH Blending/Pumping Facility
Louis Dreyfus Energy Partners/Colonial Pipeline
Capline Turnaround
Calpine Generating Facility
Houston Controls Completes Power Station Checkout against a hard deadline